Thursday 24 October 2013

Fixing stage billed.

So the bill for fixing stage has arrived although there are still a few things missing (like basins and the laundry trough) but we'll leave that to the bank inspector. 

Downstairs tiling has started. Last week, concrete was poured around the boundary in anticipation of the brick fence. The rain has caused some delays with this brickwork but overall, progress has been good. 


Master ensuite.

For those interested, tiles are white and beige; cabinets: classic white; benchtop: Linen caesarstone.